The overtime and holiday rates are based on the total amount of wages and fringe benefits combined. The rate of pay for overtime is one and a half times the amount of the prevailing hourly rate of wages or the public works contracting minimum wage (whichever is applicable). The rate for holidays is twice the applicable rate.